THE FOUR-STAGE CIRCULATING SYSTEM «INKOR-80-UCS» FOR BORING BRUNCH HOLES
FUNCTION
The circulating system “INKOR-80-UCS” for boring branch holes is designed for the circulation of a drilling fluid during well-boring, its storage, its cleaning of cuttings, preparation of drilling fluids, their delivery into circulation, and the circulating preparation and processing of drilling fluids. The separator of a drilling fluid supplied with the circulating systems is used to eliminate showings of oil and gas in the process of boring. SPECIFICATIONS
|
PARAMETERS |
VALUE |
|
Total mud volume, m³ |
72,5 |
|
Primary purification compartment volume, m³ |
5,2 |
|
Top-up compartment volume, m³ |
3,25 |
|
Preparation compartment volume, m³ |
15,8 |
|
Reserve-capacity compartment volume, m³ |
28,6 |
|
Operating-capacity compartment volume, m³ |
19,6 |
|
Volume for the input of liquid agents into the collector of boring pumps, m³ |
0,05 |
|
Boring pump capacity, hp, not more |
20 |
|
Cleaner capacity, hp, not more Vibrating sieves Centrifuges Cyclone separators |
30 20 3 |
|
Capacity of the boring fluid separator, m³/h, not more Gas Fluid |
6000 200 |
|
Capacity at the preparation of drilling fluids, m³/h, not more |
120 |
|
Overall dimensions of packages, m, not more Length Width Height |
12 2,45 2,6 |
|
Weight of packages, tons, not more |
12 |
|
Assembled weight, tons, not more |
40 |
NOTE
The above equipment can differ in volume, capacity, configuration, shelter availability, and power equipment. The configuration can be changed on the request of a client.
1OUR PARTNERS
Over many years of successful work we have gained a huge experience of collaboration with many multisectorial organizations. Steady long-term relations are the base of our successful cooperation with partners.
We seek to establish long-term relations with our strategic partners and then enhance our common activities in realizing brand new mutually advantageous projects.